Prototype 2 - Week Long Work Session

With our second testing trip less than a week away, the team accelerated our building process. We got the second prototype (which includes motor and piston integration as well as the full size rollers) done before Daniel and Joyce head to Hawaii!

Sorry, the PDF could not be displayed.